MANILA, Philippines — President Ferdinand Marcos Jr. on Sunday visited Tuba, Benguet to inspect a rock shed project on Camp 6 in Kennon Road.
Accompanied by Baguio City Mayor Benjamin Magalong, Marcos again expressed his dismay after seeing that the P264-million project of the Department of Public Works and Highways (DPWH), completed in November 2024, is in “precarious condition.”, This news data comes from:http://www.052298.com
“It’s as if nothing was done,” he lamented in Filipino. “It has eroded. It eroded because the protection wall is very weak.”
“It is very low and very weak that’s why the water can seep in,” he added.
Parts of the structure’s foothold caved in when Typhoon Emong pummeled the region last July.

Marcos inspects rock shed project in Benguet
- Sarah Discaya grilled by Senate over alleged DPWH links
- DPWH seeks lookout bulletin vs officials, contractors in ghost projects
- Filipino member of AHOP K-pop group says Manila concert a dream come true
- PH, Australia, Canada hold maritime drills in West Philippine Sea
- Modi and Putin affirm special relationship as India faces steep US tariffs over Russian oil imports
- Artikulo Onse' group calls for independent panel to probe flood control corruption
- Thousands protest in Indonesia as military deployed in capital
- Japanese volunteers to PH 'bedrock' of bilateral relations, says envoy
- Public Works Chief Vince Dizon demands courtesy resignations to 'clean house'
- Corruption crackdown: VP Sara Duterte, lawmakers call for deeper probe into government